JORDAN HYDROELECTRIC PLANT

SITE DIVE SURVEY

>>HOME<

2 UNITS 4.5 MW

----UNDER CONSTRUCTION----

2- MODULAR KAPLAN TURBINE GENERATOR UNITS

US ARMY CORPS OF ENGINEERS' DAM

---JORDAN CONSTRUCTION PAGES---

----PAGES----

 

DIVING SURVEY AT TOWER

LAUNCHING BARGES 

 

GRAINGER UNDERWATER SERVICES (GUS) / NORTH FORK ELECTRIC INC. (NFEI)

 

LAUNCHING BARGES

LOADING EQUIPMENT

 

POSITIONING BARGE AT TOWER FACE

INSTALLING CAPTURE BUMPERS

 

SIDE CAPTURE BUMPERS

UPSTREAM CAPTURE BUMPERS

 

DIVERS STATION

DIVER PREPARATION

 

PAUL CHLEBOWSKI / DIVE MASTER, GUS

DIVER STAGING

 

MEASUREMENT JIG PLACEMENT

HOT WATER DIVE